Silver Ridge Elementary School

Education | PK, K-5

  • Silverdale, WA

  • This project was a steep slope metal roof that was removed down to the wood substrate and then a cover board mechanically fastened before receiving an adhered PVC membrane roof with Décor ribs welded on to have the aesthetics of a standing seam metal roof. This work was performed by Brad Badger and his crew.